Skip to main content
[ START WITH THE PROJECT ]

Use cases for the decisions that happen before a waterless radiant project.

Choose the condition closest to your project, then review the required inputs, capabilities, evidence, responsibility boundaries, and next decision gate.

[ ICP FIT ]

The strongest projects share three signals.

Use cases are designed to screen for project readiness before a visitor reaches commercial scope.

EARLY ENOUGH

The floor and mechanical concept are still open

The team can coordinate build-up, finishes, equipment, air distribution, controls, and trade sequencing.

DELIVERY OWNER

A qualified local HVAC party is involved

Refrigerant work, commissioning, troubleshooting, handoff, and service have a credible local owner.

EVIDENCE-LED

The buyer accepts project-specific review

Loads, local requirements, equipment, controls, evidence, and responsibilities will be resolved before commitment.

[ START WITH THE JOB ]

Select the job the project team needs to complete.

Each page connects the problem to project inputs, target workflow, capabilities, industry context, objections, evidence, and a contextual review CTA.

[ BUYER JOURNEY ]

Move from curiosity to a qualified project.

The content journey should answer different questions at each stage instead of repeating the same product description.

  1. 01

    Problem recognition

    Can we get radiant comfort without designing a hydronic floor loop?

    Core architecture and alternative comparisons

  2. 02

    Solution exploration

    Could this work in our building, climate, floor assembly, and mechanical concept?

    Industry and use-case fit pages

  3. 03

    Capability validation

    How are heating, cooling, controls, circuits, installation, and service handled?

    Capability pages and responsibility scope

  4. 04

    Evidence review

    What is documented, what is overseas reference material, and what remains project-specific?

    Evidence and reference pages

  5. 05

    Project decision

    Who owns the next design, site, commissioning, and commercial steps?

    Live project review form

  6. 06

    Use and expansion

    What did the first project teach us about design, installation, service, and local demand?

    Post-project review and documentation update

[ EVIDENCE NEEDED ]

Bring evidence that matches the stage.

Early visitors need clear architecture; project teams need detailed inputs, responsibility, testing, commissioning, and service evidence.

Architecture diagrams

Explain refrigerant-direct radiant heating, air-side cooling, optional hot water, and controls without category confusion.

Project input checklist

Location, plans, loads, floor assemblies, cooling, electrical, project team, schedule, local requirements, and service.

Responsibility matrix

Assign design, procurement, trades, testing, commissioning, documentation, warranty coordination, and service.

Reference limits

Label overseas references clearly and avoid turning project scale into an unsupported outcome claim.

Does one of these use cases match your project?

Share the building type, region, design stage, floor scope, HVAC team, timing, and current decision point. HT will review fit before proposing a next step.

Review Your Project